Thinking of building a house or adding a bedroom? Is your leach field failing?
Septic system design is sometimes over looked in the building process and should be considered carefully, as a priority. A proper functioning septic system starts with a great design which considers many factors including:
- State of New Hampshire and Local Town Requirements
- Placement of your house, drainage, tank and leach field
- Proper design for future use including water filtration systems, whirlpool bath tubs, etc.
- Proper leach field placement for future use including swimming pools
- Review of your land for proper slope, flat designs, pump or raised systems
- Review of the soils for proper leaching
Septic system design starts with a State of NH licensed designer. Please contact Jackie Roy of AJ Roy Excavation, LLC. Jackie is a licensed designer and installer. She currently represents the installers on the board of directors for the Granite State Designers and Installers Association. Other licensed professionals can be found through the State of NH Department of Environmental Services. Many well qualified designers are also active in Granite State Designers and Installers Association which is a nonprofit association of septic system professionals.
